Petra Group continues construction works at a fast pace on the seaside project of Petra Sea Resort. We are excited to share the latest updates on blocks B and C.

๐Ÿ“ Block C
๐Ÿ”น Preparation of the formwork for the 21st floor monolithic slab is underway.
๐Ÿ”น Masonry work of interior partitions has been completed on the 5th and 6th floors.
๐Ÿ”น Masonry work is in progress on the 7th and 8th floors.
๐Ÿ”น Installation of aluminum facade glazing is ongoing on the 3rd and 4th floors.
๐Ÿ”น Balcony railing installation is underway on the 11th floor.

๐Ÿ“ Block B
๐Ÿ”น Preparation of the 17th floor monolithic slab for concreting is ongoing.
๐Ÿ”น Interior masonry works are in progress on the 2nd, 3rd, 4th, 5th, 7th, 8th, and 10th floors.